Name of the Phase of Development: Phase 1 (the "Phase") of High Park ("the Development")︱This advertisement intends to promote the sale of residential properties in Phase 1 of the Development only.

District: Hung Shui Kiu and Ha Tsuen︱Name of the street and the street number of the Phase: 1 Hung On Lane*︱The website address designated by the Vendor for the Phase: www.highpark.hk/phase1︱The photographs, images, drawings or sketches shown in this advertisement/promotional material represent an artist’s impression of the development concerned only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques. Prospective purchasers should make reference to the sales brochure for details of the development. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby.

Vendor: Union Rich Resources Limited︱Holding company of the Vendor: Rich Favour Ltd, Gold Button Inc., Get Rich Enterprises Limited, Linkforce Investments Limited, Ominex Corporation, Asia Standard Development (Holdings) Limited, Asia Standard International Limited and Asia Standard International Group Limited︱Authorized Person of the Phase: Lee So Kwan Doris︱The firm or corporation of which the Authorized Person of the Phase is a proprietor, director or employee in his or her professional capacity: Associated Architects Limited︱Building Contractor for the Phase: Hien Lee Engineering Company Limited︱The firms of solicitors acting for the Owner in relation to the sale of residential properties in the Phase: Chan, Lau & Wai Solicitors︱Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: The Hongkong and Shanghai Banking Corporation Limited︱Any other person who has made a loan for the construction of the Phase: Get Rich Enterprises Limited︱The estimated material date for the Phase to the best of the Vendor’s knowledge: 30 June 2025. Material date means the date on which the conditions of the land grant are complied with in respect of the Phase. The estimated material date is subject to any extension of time that is permitted under the Agreement for Sale and Purchase.︱This advertisement is published by the Vendor or with the consent of the Vendor.︱Please refer to the sales brochure for details. Prospective purchaser is advised to refer to the sales brochure for any information on the phase.︱*The provisional street number is subject to confirmation when the Phase is completed.︱Date of production: 15 April 2023

Sales Information
Terms & Conditions
Terms & Conditions

Photo

The photo was taken with aerial photography equipment at a high altitude near Siu Hong Station ofTuen Ma Line on 20th August 2022. It was not taken near the Development and/or the Phase. It is edited and processed with computerized imaging technique and the conceptual design drawing of the Development and/or the Phase is edited into the photo. It does not represent the external appearance, view, facilities, surrounding buildings and environment of and from the Development and/or the Phase or any part thereof. It is not related to the Development and/or the Phase, and is for reference only. Please refer to the following disclaimer of the conceptual design drawing. The photo does not constitute and shall not be construed as the Vendor making any express or implied offer, representation, undertaking or warranty. Prospective purchasers should not rely on the photo for any purpose or use whatsoever.

Stock photos

Stock photo, which is edited and processed with computerized imaging technique. It is not taken from the Development and/or the Phase or its vicinity, and is not related to the Development and/or the Phase. It does not represent the external appearance or view of and from the Development and/or the Phase or any part thereof after completion, and is for reference only. The photo does not constitute and shall not be construed as the Vendor making any express or implied offer, representation, undertaking or warranty.

Renderings

The conceptual design drawing only represents the maker's impression of the Development and/or the Phase and is for reference only. It is not drawn to scale and does not represent the external appearance or view of and from the Development and/or the Phase or any part thereof after completion. The building, facilities and environment of the Development and/or the Phase and in its vicinity shown in the conceptual design drawing may have been simplified or omitted. The facilities, fittings, finishes, appliances, decorations, lighting, furniture, displays, plants, landscaping and other objects shown in the conceptual design drawing are not standard provisions, and may not appear in the Development and/or the Phase or its vicinity upon completion. Air-conditioning units, pipes, grilles and gondolas at the external walls are also omitted. The Vendor reserves the right to alter the building plans which shall be subject to the final approval of the relevant Government department(s). Standard provisions fittings, finishes and appliances of residential properties shall be subject to the terms and conditions of the agreement for sale and purchase. Please refer to the sales brochure for details. The Vendor advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding and the public facilities nearby. The conceptual design drawing does not constitute and shall not be construed as the Vendor making any express or implied offer, representation, undertaking or warranty. Prospective purchasers should not rely on the conceptual design drawing for any purpose or use whatsoever.

Source of Information

1. Source of Information : The Chief Executive’s 2022 Policy Address (https://www.policyaddress.gov.hk/2022/public/pdf/policy/policy-full_tc.pdf) | 2. Source of Information : Website of Northern Link Connect Beyond Mobility from MTR (https://mtrnorthernlink.hk/tc/about) | 3. Source of Information : news.gov.hk — New Huanggang Port will be completed by the end of 2023 at the earliest (https://www.news.gov.hk/chi/2021/03/20210302/20210302_165415_620.html) | 4. The above driving time (2 minutes) was obtained from onsite testing and evaluation by private car on 1st August 2022. The testing was carried out on Hung On Lane, which is located outside the high park development, and ends at Castle Peak Rd—Hung Shui Kiu. The tested driving time is for reference only. The actual driving time may vary depending on factors such as vehicle, road conditions, traffic, weather, driving route, and other factors. | 5. Source of Information : Hung Shui Kiu New Development Area Planning and Engineering Study (https://www.hsknda.gov.hk/files/rodp/Information_Digest.pdf) | 6. Source of Information : “Strategic Studies on Railways and Major Roads beyond 2030” —Railway Proposals (https://rmr2030plus.hk/about-2030/railway-plan/) | 7. Source of Information : Project information — Official website of MTR Hung Shui Kiu station (https://mtrhungshuikiu.hk/) | 8. The estimated driving time to each district are calculated based on non-peak hours and smooth traffic conditions, with the starting point being the Hung On Lane, which is located outside the high park development. The driving times are for reference only and have been obtained from Google Maps (www.google.com.hk/maps) and amap.com (www.gaode.com). The driving times may vary depending on the actual traffic conditions. ¬The Vendor makes no express or implied offer, representation, undertaking or warranty. | 9. Source of Information : Journey time from MTR Hung Shui Kiu Station to MTR Tin Shui Wai Station – Press Release from The Government of the Hong Kong Special Administrative Region - Government invites MTRCL to proceed with detailed planning and design of Hung Shui Kiu Station (https://www.info.gov.hk/gia/general/202105/27/P2021052700291.htm) From MTR Tin Shui Wai Station to MTR Yuen Long Station, MTR Tsuen Wan West Station, MTR East Tsim Sha Tsui Station, MTR Kowloon Station, MTR Exhibition Centre Station and MTR Central Station. The source of the journey time required (platform to platform): MTR Corporation Limited website (www.mtr.com.hk), the content is for reference only. Relevant information is for reference only and is subject to actual traffic conditions. | 10. The above walking time (1.5 minutes) was obtained from onsite testing and evaluation by staff on 1st August 2022. The testing was carried out on Hung On Lane, which is located outside the high park development, and ends at Light Rail Hung Shui Kiu Stop. The tested walking time is for reference only. The actual walking time may vary depending on factors such as pedestrian movement, road conditions, traffic, weather, walking route, and other factors. The above driving time (2 minutes) was obtained from onsite testing and evaluation by private car on 1st August 2022. The testing was carried out on Hung On Lane, which is located outside the high park development, and ends at Castle Peak Rd—Hung Shui Kiu. The tested driving time is for reference only. The actual driving time may vary depending on factors such as vehicle, road conditions, traffic, weather, driving route, and other factors. The above driving time (3 minutes) was obtained from onsite testing and evaluation by private car on 1st August 2022. The testing was carried out on Hung On Lane, which is located outside the high park development, and ends at Yick Yuen Road. The tested driving time is for reference only. The actual driving time may vary depending on factors such as vehicle, road conditions, traffic, weather, driving route, and other factors. | 11. The entire development includes a clubhouse with an area of approximately 9,200 square feet (including any covered and uncovered recreational facilities for residents’ use), and a communal garden or play area with an area of approximately 21,000 square feet (covered and uncovered) (whether known as a covered and landscaped playgrounds or otherwise). Owners, residents and their guests of all the residential properties in the development may use the clubhouse and recreational facilities subject to the terms and conditions of the Deed of Mutual Covenant, relevant government licenses, regulations, and may be required to pay fees. The clubhouse and recreational facilities may not be available for use when the residential properties are occupied. The clubhouse and its recreational facilities, communal gardens and play areas will be opened and put into use according to the occupation schedules of individual phases when residential properties are occupied. | 12. The names of the Clubhouse and its various facilities are promotional names, which may not be the same as their names when the Clubhouse is commissioned and will not appear in the deed of mutual covenant, preliminary agreement for sale and purchase, formal agreement for sale and purchase, assignment or other title or legal documents. Th­e Clubhouse and the recreational facilities may not be available immediately upon handover. Th­e use or operation of certain facilities and / or services may be changed from time to time and may be subject to the consent or permit issued by the relevant Government departments and the relevant laws, rules, provisions in the land grant and deed of mutual covenant, the clubhouse rules and the actual site conditions. ­The Vendor reserves its rights to add or remove the Clubhouse, the recreational facilities and other facilities, and to amend their design and use without notice, which shall be subject to the final approval of the relevant Government department(s). ­The information on the Clubhouse and recreational facilities are for reference only, which shall not constitute or be construed as the Vendor making any express or implied offer, representation, undertaking or warranty. ­The use of Clubhouse and recreational facilities may be subject to additional charges.
Stock photo
At the heart of Hung Shui Kiu, high park taps into the metropolis of the future, a new CBD of the north 1, braced for epic transformation. Named by the HKSAR Government as one of the centrepieces of the Northern Metropolis revamp, high park will reap every possible rewards that come with it. With unbeatable connectivity, an abundance of green space and so much more.

The Northern Metropolis

Hung Shui Kiu –
a new CBD in the making

high park is primely located at the heart of  the Hung Shui Kiu/ Ha Tsuen New Development Area (NDA) 1. While already a thriving and vibrant area, it is entering a period of massive change driven by unprecedented government investment into logistics, commerce and technology 5, supported by exceptional transportation networks including the Hung Shui Kiu Light Rail Station and the future Hung Shui Kiu Station on the Tuen Ma Line 7. Hung Shui Kiu will soon become an economic powerhouse in the Northwest, alongside the San Tin Technopole and the rich natural and tourism resources on the east side, forming the great North Metropolis.

Upon completion, the Northern Metropolis will emerge as a world class IT city, integrating quality life, new economies, culture and leisure.

Photo

Transportation

Exceptional connectivity to every part of the City

Make the most of local transport and jump on a light rail, train or bus to get to any part of Hong Kong. The Hung Shui Kiu Light Rail Station6 is just over a minute walk from high park, connecting you to neighbouring suburbs like Tuen Mun, Yuen Long and Tin shui Wai. The future Hung Shui Kiu Station on the Tuen Ma line (expected to start construction in 20247) will take you to Kowloon effortlessly via the Tuen Ma Line or Central Rail Link (Proposed6).

Or link up to leading employment precincts such as the San Tin Technopole by the Northern Link (Planning2) via Kam Sheung Road Station or go further up to Shenzhen via the new Huanggang Port (To be completed in 20233), operating 24/7. Opportunities become virtually limitless.  

Drivers will be spoiled by the close proximity between high park and Castle Peak Road, commuting to Hong Kong International Airport8, or the Qianhai cooperation zone in Shenzhen8, has never been easier.

The future looks even brighter with the upcoming Northern Metropolis Highway (proposed1), bound to provide an even more seamless connection between northern New Territories, Tin Shui Wai and North Kwu Tung.

Distance from Hung Shui Kiu Station on the Tuen Ma Line9 to key areas of Hong Kong:
Yuen Long Station
Approx.10minutes
Tsuen Wan West Station
Approx.20minutes
East Tsim Sha Tsui Station
Approx.33minutes
Kowloon Station
Approx.36minutes
Exhibition Centre Station
Approx.41minutes
Central Station
Approx.46minutes

Lifestyle

Realise your own way of life

The location of high park enables a connected, cosmopolitan lifestyle surrounded by nature. Hung Shui Kiu is set to become a convergence of culture5, new economies and quality living. With convenient transport links, every day will be an adventure. Add to the mix top class healthcare facilities, plus great shopping, dining and recreational hotspots, it’s easy to see why you’d want to call high park home.

Amenities

Much more than a place to stay

Spanning over 30,000 ft², experience the perfect blend of Japanese minimalism and modern design at our clubhouse11 and garden. Boasting wooden walls, fences and ceilings, pristine stonework, and clever use of neutral-toned fabrics with bespoke furniture, it exudes with a sense of subtle luxury and welcomeness. Made exclusively for high park’s residents of all ages.

360° Virtual Tour

Coming Soon

Promotional Materials