Name of the Phase of Development: Phase 1 (the "Phase") of High Park ("the Development")︱This advertisement intends to promote the sale of residential properties in Phase 1 of the Development only.
District: Hung Shui Kiu and Ha Tsuen︱Name of the street and the street number of the Phase: 1 Hung On Lane*︱The website address designated by the Vendor for the Phase: www.highpark.hk/phase1︱The photographs, images, drawings or sketches shown in this advertisement/promotional material represent an artist’s impression of the development concerned only. They are not drawn to scale and/or may have been edited and processed with computerized imaging techniques. Prospective purchasers should make reference to the sales brochure for details of the development. The vendor also advises prospective purchasers to conduct an on-site visit for a better understanding of the development site, its surrounding environment and the public facilities nearby.
Vendor: Union Rich Resources Limited︱Holding company of the Vendor: Rich Favour Ltd, Gold Button Inc., Get Rich Enterprises Limited, Linkforce Investments Limited, Ominex Corporation, Asia Standard Development (Holdings) Limited, Asia Standard International Limited and Asia Standard International Group Limited︱Authorized Person of the Phase: Lee So Kwan Doris︱The firm or corporation of which the Authorized Person of the Phase is a proprietor, director or employee in his or her professional capacity: Associated Architects Limited︱Building Contractor for the Phase: Hien Lee Engineering Company Limited︱The firms of solicitors acting for the Owner in relation to the sale of residential properties in the Phase: Chan, Lau & Wai Solicitors︱Authorized institution that has made a loan, or has undertaken to provide finance, for the construction of the Phase: The Hongkong and Shanghai Banking Corporation Limited︱Any other person who has made a loan for the construction of the Phase: Get Rich Enterprises Limited︱The estimated material date for the Phase to the best of the Vendor’s knowledge: 30 June 2025. Material date means the date on which the conditions of the land grant are complied with in respect of the Phase. The estimated material date is subject to any extension of time that is permitted under the Agreement for Sale and Purchase.︱This advertisement is published by the Vendor or with the consent of the Vendor.︱Please refer to the sales brochure for details. Prospective purchaser is advised to refer to the sales brochure for any information on the phase.︱*The provisional street number is subject to confirmation when the Phase is completed.︱Date of production: 15 April 2023
Photo
Stock photos
Renderings
Source of Information
high park is primely located at the heart of the Hung Shui Kiu/ Ha Tsuen New Development Area (NDA) 1. While already a thriving and vibrant area, it is entering a period of massive change driven by unprecedented government investment into logistics, commerce and technology 5, supported by exceptional transportation networks including the Hung Shui Kiu Light Rail Station and the future Hung Shui Kiu Station on the Tuen Ma Line 7. Hung Shui Kiu will soon become an economic powerhouse in the Northwest, alongside the San Tin Technopole and the rich natural and tourism resources on the east side, forming the great North Metropolis.
Upon completion, the Northern Metropolis will emerge as a world class IT city, integrating quality life, new economies, culture and leisure.
Make the most of local transport and jump on a light rail, train or bus to get to any part of Hong Kong. The Hung Shui Kiu Light Rail Station6 is just over a minute walk from high park, connecting you to neighbouring suburbs like Tuen Mun, Yuen Long and Tin shui Wai. The future Hung Shui Kiu Station on the Tuen Ma line (expected to start construction in 20247) will take you to Kowloon effortlessly via the Tuen Ma Line or Central Rail Link (Proposed6).
Or link up to leading employment precincts such as the San Tin Technopole by the Northern Link (Planning2) via Kam Sheung Road Station or go further up to Shenzhen via the new Huanggang Port (To be completed in 20233), operating 24/7. Opportunities become virtually limitless.
Drivers will be spoiled by the close proximity between high park and Castle Peak Road, commuting to Hong Kong International Airport8, or the Qianhai cooperation zone in Shenzhen8, has never been easier.
The future looks even brighter with the upcoming Northern Metropolis Highway (proposed1), bound to provide an even more seamless connection between northern New Territories, Tin Shui Wai and North Kwu Tung.
The location of high park enables a connected, cosmopolitan lifestyle surrounded by nature. Hung Shui Kiu is set to become a convergence of culture5, new economies and quality living. With convenient transport links, every day will be an adventure. Add to the mix top class healthcare facilities, plus great shopping, dining and recreational hotspots, it’s easy to see why you’d want to call high park home.
Spanning over 30,000 ft², experience the perfect blend of Japanese minimalism and modern design at our clubhouse11 and garden. Boasting wooden walls, fences and ceilings, pristine stonework, and clever use of neutral-toned fabrics with bespoke furniture, it exudes with a sense of subtle luxury and welcomeness. Made exclusively for high park’s residents of all ages.